7、桩机出厂全部装配有脚刹及手刹,刹车方便有效,更加适合山区的施工,提高了山区施工的安全性及效率。
1, the efficiency of pile driving faster, higher, save the construction time, reduce the labor costs.
2, pile driver abandoned the previous traditional structure, adopt the frame structure, use gb steel, pile drivers more solid solid chassis, in construction of more resistant to vibration.
3, design and manufacture of radiator, greatly improving the whole hydraulic system cooling capacity.
4, the unique patented technology, made at the site of ferry transportation is very convenient and shorter than the same kind equipment for at least 2 to 3 hours.
5, to develop a drill of patent technology, reduce the purchase cost and improve the construction efficiency, effectively solves the problem of the need when driving piles.
6, can assemble two-cylinder diesel engine, greater horsepower, more stable operation, saves water, water, water woes.
All seven, pile machine factory equipped with foot and hand brake, the brake is convenient and effective, more suitable for the construction of the mountain, to improve the security and efficiency of mountainous region construction.
加客服铁哥微信
邀请进群
精准对接行业老板
加客服铁哥微信
邀请进群
精准对接行业老板
掌握全局,把握市场
买设备,就上铁臂商城!
为用户提供挖掘机、装载机、起重机等工程机械设备的信息查询、设备询价、产品投诉等服务。